City
Epaper

NHAI inaugurates cashless Kashi Toll Plaza on Delhi-Meerut expressway

By ANI | Updated: April 1, 2022 12:45 IST

National Highway Authority of India on Friday inaugurated Kashi toll plaza on the Delhi-Meerut expressway.

Open in App

National Highway Authority of India on Friday inaugurated Kashi toll plaza on the Delhi-Meerut expressway.

The toll plaza on around 90 km long Delhi-Meerut expressway is completely cashless and the tax will be deducted from FASTag.

The toll manager Kailash said, "This is the first 100 per cent 'digital mode' toll plaza. Fifty-five rupees will be charged for cars on the 90 km long expressway. Cars without FASTag will be penalised."

To ensure public safety and avoid accidents due to overspeeding and rash driving, the authorities have installed cameras on the toll plaza.

"We have installed cameras to check overspeeding. Toll tax will not have to be paid during entry on Delhi Meerut Expressway. Rather, the toll will be deducted at the exit point. That is, the more the vehicle runs, the more tax will have to be paid," added Kailash.

In other news, NHAI on Thursday had revised toll fee rates for the Delhi-Meerut expressway by 10-15 per cent. The new rates will be effective from Friday, April 1, 2022, and will vary for different vehicles.

The previous rates for cars/jeeps were Rs 140, while Rs 155 will be charged as per the revised rates, for the stretch between the toll plaza on Sarai Kale Khan and the Kashi toll plaza in Meerut.

The new rates from Sarai Kale Khan to Rasoolpur Sikrod Plaza are Rs 100 and Rs 130 will be charged to go to Bhojpur.

The tax will be charged at the six entry/exit points located at the expressway; Sarai Kale Khan, Indirapuram, Dundahera (Vijay Nagar), Dasna, Rasoolpur Sikrod, Bhojpur and the main toll plaza is located at Kashi in Meerut.

The 14-lane expressway has four phases. Phase 1 links Sarai Kale Khan in Delhi and UP Gate in Ghaziabad, phase 2 connects UP Gate and Dasna in Ghaziabad. The third phase connects Dasna to Hapur, while phase 4 is a 32-km six-lane access-controlled alignment between Dasna and Meerut in UP.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Sarai Kale KhanNhaiNational Highway Authority Of India
Open in App

Related Stories

Navi MumbaiWestern Entry to Navi Mumbai Airport on Track for June 2025 Completion

NationalNHAI Increases Toll Charges by 4-5% Across Highways and Expressways Across Country

NationalNHAI Rolls Out New Guidelines to Enhance Safety on National Highways and Expressways

MaharashtraMumbai-Nashik Highway Traffic: Thane District Collector Inspects Road Condition, Orders Immediate Pothole Repairs

NagpurFeasibility Survey for NHAI's Nagpur-Hyderabad Expressway to Begin Soon

National Realted Stories

NationalMissile-like object falls into Srinagar's Dal Lake, drone shot down over Srinagar airfield

NationalOperation Sindoor: Karnataka govt cracks down on fake, provocative content online

National'Operation Sindoor' has raised the cost of supporting terrorism for Pakistan, says Retd Lt. Gen Dua

NationalKarnataka CM convenes special meeting amid rising tensions with Pak

NationalNitish Kumar to hold high-level meeting in Purnea amid rising India-Pak tensions