City
Epaper

Power supply to rural tehsil office disconnected

By Lokmat English Desk | Updated: October 13, 2022 22:15 IST

Aurangabad, Oct 13:Maharashtra State Electricity Distribution Company Ltd (MSEDCL) disconnected the electricity supply to the rural tehsil office ...

Open in App

Aurangabad, Oct 13:

Maharashtra State Electricity Distribution Company Ltd (MSEDCL) disconnected the electricity supply to the rural tehsil office in the district collectorate premises due to the overdue bill of Rs 6.5 lakh on Thursday. All the online administrative works in the office hampered due to disruption of the power supply.

Tehsildar Jyoti Pawar contacted the MSEDCL engineers and asked them to regularize the power supply. However, they told that the power supply will resume only after the bills are paid.

Tags: Maharashtra State Electricity Distribution Company Ltd
Open in App

Related Stories

AurangabadUninterrupted power supply to industries in private guts

AurangabadPower outage scheduled for Bidkin area for infrastructure shifting

AurangabadMissed call, toll-free, sms, app for power failure

AurangabadTwo DPs in Kadrabad village defunct for a month

AurangabadIndustries seek uninterrupted power supply for smooth operations

Aurangabad Realted Stories

Aurangabad‘Festival Market’ plan remains on paper

AurangabadYoung Voices Speak on AI, Stress & Sustainability at elocution competition

Aurangabad46-year tradition of Ravan Dahan continues at Ramlila Maidan

AurangabadBhim sagar overflows as Vishuddhanand Bodhi Foundation launches 25-acre project at Aurangabad Caves

AurangabadAuric Bidkin to receive water supply through 900 mm-diameter dedicated pipeline