City
Epaper

Power supply in rural areas up from 12.5 hours in 2014 to 22.4 hours now: Manohar Lal

By IANS | Updated: January 18, 2025 16:10 IST

New Delhi, Jan 18 The power availability in the urban areas has improved from 22 hours to 23.4 ...

Open in App

New Delhi, Jan 18 The power availability in the urban areas has improved from 22 hours to 23.4 hours over the past decade, while in rural areas, it has increased significantly from 12.5 hours to 22.4 hours, Union Power Minister Manohar Lal said on Saturday.

Emphasising the implementation of smart meters installations, the Union Minister said smart meters benefit both consumer and distribution companies by reducing billing errors, enhancing energy efficiency, and providing greater convenience for users -- helping DISCOMs in reducing losses, optimisation of power purchase cost and integration of renewable energy, etc.

The minister was speaking at meeting of the Consultative Committee of the Members of Parliament for the Ministry of Power to discuss the "Implementation of Revamped Distribution Sector Scheme (RDSS)”.

Manohar Lal highlighted the necessity to add additional generation and transmission capacities for meeting the ever-growing demand in the country.

The Union Minister also shared that every census village in the country is now electrified, and the aim is now to enhance the quality of services being offered to promote the ease of living for consumers.

The Ministry of Power, in coordination with the Ministry of New and Renewable Energy, has undertaken several measures to alleviate the difficulties consumers faced while installing roof-top solar systems under PM Surya Ghar Muft Bijli Yojana.

These measures include waiving the requirement for Technical Feasibility Study for connections up to 10 kW, implementing deemed load enhancement for RTS installations up to 10 kW, etc.

The minister called upon the state governments to take initiatives to promote rooftop solar schemes for the benefit of consumers.

Shripad Yesso Naik, Minister of State for Power and New and Renewable Energy, highlighted the significant role of the Revamped Distribution Sector Scheme (RDSS) in improving service quality and building consumer trust.

“The effective implementation of projects under RDSS would strengthen the financial sustainability of DISCOMs while ensuring the delivery of reliable and high-quality power to the consumers,” said Naik.

The government launched RDSS with an outlay of Rs 3,03,758 crore with an estimated gross budgetary support (GBS) of Rs 97,631 crore from the Central government.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

International'Situation in Bangladesh tense, volatile': Former Minister Mohibul Hasan Chowdhury

Other SportsU19 Asia Cup: Minhas hits blistering 172 as Pakistan win title after beating India by 191 runs

HealthHimachal CM launches campaign to administer polio drops to 6 lakh children

EntertainmentBabul Supriyo recollects being brutally trolled in connection with M. S. Dhoni

NationalPresident Droupadi Murmu gives assent to VB — G RAM G Bill, 2025

Business Realted Stories

BusinessNHPC to start commercial operations of Subansiri Project’s 2nd unit on Dec 23

BusinessPhilippines extends sugar import ban until December 2026

BusinessGovt e-Marketplace helps to rake in Rs 2,200 crore via e-waste, scrap sale

BusinessPM Modi lays foundation stone for Rs 11,000 crore fertiliser unit in Assam

BusinessIndia's retail boom to attract USD 3.5 billion in next 3 tears, US shopping malls crumble: Anarock