City
Epaper

Big Relief for Mumbaikars: 25,000+ Unauthorized Buildings to Get Regularized

By Lokmat Times Desk | Updated: September 12, 2025 15:18 IST

 In a major relief to lakhs of Mumbaikars, more than 25,000 buildings in the metropolis, that have long been ...

Open in App

 In a major relief to lakhs of Mumbaikars, more than 25,000 buildings in the metropolis, that have long been denied Occupation Certificates (OCs), will soon be regularised under a new government policy, Maharashtra Guardian Minister for Mumbai Suburbs Ashish Shelar announced on Thursday. The move, which comes ahead of the upcoming civic polls, aims to provide legal recognition to the structures that have been occupied for years, but were still considered “unauthorised”, news agency PTI reported.

Starting October 2, the Urban Development Department will roll out a simplified, transparent policy to grant OCs to the residents. Under this policy, buildings with withheld OCs due to technical lapses, floor space discrepancies, setback violations, or regulatory changes will be eligible for regularisation. In addition to this, if developers fail to meet obligations, like handing over reserved flats or spaces, residents will not face penalties while obtaining OCs.

Shelar called the move “pro-people” and urged the residents to take advantage of this opportunity from October 2 onwards. Residents can apply for OCs online without any extra charges. “They can apply individually or jointly for part-OC. No penalty will be levied if the application is made within the first six months. However, premiums will apply in cases involving excess FSI usage,” he added. 

The Amnesty Scheme was announced by the Mumbai suburban guardian minister and Bharatiya Janata Party (BJP) leader Ashish Shelar after he held a joint meeting with his party’s MLAs and officials from BMC, Urban Development Department (UDD), Revenue Department and Cooperation Department, on Thursday. The move is seen as a significant one, especially in light of the civic body elections expected to be held between January and February next year. 

In Thursday’s meeting, some recommendations by a group of experts and elected representatives under former North Mumbai MP Gopal Shetty, called OC Study Group, formed in the aftermath of the Willingdon View case, were accepted. Key among them were maintaining the original building line and height aligned with the Commencement Certificate (CC), preserving open spaces, ensuring parking areas are not compromised and allowing part OCs and deemed OCs (deemed OC is a provisional certificate issued when the formal OC is delayed due to administrative or technical issues though the building is ready to be occupied).

 

 

Tags: MumbaikarIllegal BuildingsAshish Shelarillegal Construction
Open in App

Related Stories

MumbaiWest Bengal Assembly Election Result 2026: ‘People Trust PM Modi,’ Says Ashish Shelar; Hails BJP’s Strong Performance

MumbaiFormer Mumbai Mayor Shubha Raul Resigns from Shiv Sena (UBT), BJP Entry Likely

Navi MumbaiNavi Mumbai: CIDCO Razes Massive Illegal Constructions in Belondakhar Logistic Park

MumbaiBandra Fort Party Controversy: Ashish Shelar Says CM Fadnavis Orders Inquiry; Claims Event Had Local Authority Consent

EntertainmentWatch: Salman Khan Spotted Running Barefoot After Visiting Ashish Shelar’s Ganpati Pandal in Mumbai

Mumbai Realted Stories

MumbaiMumbai: Woman Duped in Rs 7 Crore GST Fraud Through Fake Loan Promise After Husband’s Death

MumbaiWest Bengal Ashram Bomb Attack Case: Two Accused Arrested From Mumbai Railway Station

MumbaiMumbai Gold Theft Case: Salary Dispute Angle Emerges In Rs 5.28 Crore Gold Bangles Robbery In Kandivali

MumbaiMumbai: Man Arrested After 9-Months for Allegedly Cheating Family Members of Rs 19 Lakh in Share Investment Fraud

MumbaiMumbai: Retired Merchant Navy Radio Engineer Duped of ₹1.68 Crore by Cyber Fraudsters Posing as CBI, ED Officials