City
Epaper

3-hours power shutdown by MSEDCL affects city water supply

By Lokmat English Desk | Updated: November 15, 2024 21:40 IST

Chhatrapati Sambhajinagar:A power transformer supplying electricity to the 700 mm diameter water pipeline providing water to the city ...

Open in App

Chhatrapati Sambhajinagar:

A power transformer supplying electricity to the 700 mm diameter water pipeline providing water to the city malfunctioned, leading to a 3-hour shutdown by Mahavitaran (or MSEDCL) on Friday. Meanwhile, the municipal corporation has alerted that the city's water supply will be affected due to the incident.

The issue occurred with the transformer on the old water supply scheme at Jayakwadi. On learning the need to replace the cables, the MSEDCL scheduled a shutdown from 3 pm to 6 pm to carry out the necessary work. During this 3-hour period, the water pumping from the 700 mm diameter pipeline was stopped. As a result, water supply to the old city area, as well as the Cidco-Hudco regions, was expected to be under low pressure, said the CSMC water supply officials.

Open in App

Related Stories

InternationalDeadlock persists at Pakistan-Afghanistan talks in Turkiye over Taliban's refusal to act against TTP

CricketRohit Sharma receives 'Impact Player of the Series' award following Sydney ODI ton

Other SportsNorris reclaims F1 championship lead with dominant Mexican GP win

NationalRajasthan Bus Accident: 15 Passengers Injured After Bus Collides With Milk Tanker in Pali (Watch Video)

NationalCrucial day for Kerala’s Left parties over PM SHRI row

Aurangabad Realted Stories

AurangabadDiwali lights up Gangapur’s political scene ahead of Municipal Elections

AurangabadPost of Land Records Training Academy lying vacant

AurangabadChhatrapati Sambhajinagar rural police organizes ‘Walk for Unity’

AurangabadPothole hell: Chhatrapati Sambhajinagar–Ahilyanagar highway sparks outrage

AurangabadRevised merit list for MBBS/BDS 3rd round to be released today