City
Epaper

Technical issue hits harbour line, trains running late

By Lokmat English Desk | Updated: December 15, 2022 08:48 IST

Signalling system at Jui Nagar railway station in Mumbai witnessed technical an issues and has not been working normally ...

Open in App

Signalling system at Jui Nagar railway station in Mumbai witnessed technical an issues and has not been working normally since 6 am. The Central SPRO informed about the issue and the change in the routes on account of the fault. The official also informed that the staff was resolving the isssue.

A tweet from ANI read, "Mumbai: Signal problem at Jui Nagar railway station. Point not coming to normal since 6 am. Services running between CSMT & Vashi on Harbor line and Thane to Nerul on Trans-Harbor line. Staff is resolving the issue. It'll be sorted out in another 15-20 mins: Central Railway SPRO"

Tags: Harbour lineRailwayMumbai Local Trains
Open in App

Related Stories

MumbaiMumbai Local Train Update: Harbour Line Services Delayed Due to Waterlogging Between These Stations Amid Heavy Rains

MumbaiMumbai Mega Block on August 17, 2025: No Block on Central, Harbour Lines; Only Western Line to Face Disruptions; Check Timings

MumbaiMumbai Rains: Waterlogging Between Tracks on Central, Western and Harbour Lines Disrupts Local Train Services

MumbaiMumbai Weather Update: Heavy Rains Disrupt Local Train Movement, Yellow Alert in Place Till August 18

MumbaiMumbai Local Train Upgrade: 7 Big Changes Coming by 2027

Maharashtra Realted Stories

ThaneThane Schools and Colleges Closed on August 19 Amid IMD's Red Alert for Heavy Rain

MaharashtraMaharashtra TAIT Result 2025 Declared at mscepune.in; Heres How to Check

MumbaiMumbai Accident: Mother and Son Killed After Being Run Over by BEST Bus in Wadala

MumbaiMumbai: Customs Seize Drugs Worth Rs 8.56 Crore at CSMI Airport, Two Held

MaharashtraMaharashtra: Drunk Driver Hits Pedestrians, Rams Vehicles in Chhatrapati Sambhajinagar