City
Epaper

Nashik Water Crisis: Dam Levels Drop to 33% as Heatwave Grips District

By Chitra Rajguru | Updated: April 30, 2025 18:22 IST

As temperatures continue to soar across Nashik district, the water stock in local dams is rapidly declining. Currently, the ...

Open in App

As temperatures continue to soar across Nashik district, the water stock in local dams is rapidly declining. Currently, the district’s 24 dams together hold only 22,750 million cubic feet (mcft) of water—just 33% of their total capacity.

The Manikpunj dam has completely dried up, while eight other dams have dropped below the 20% mark and are expected to run dry soon if no rainfall is received. This situation is concerning, especially since the district had received satisfactory rainfall during last year’s monsoon, filling most dams and reservoirs.

Initially, authorities believed that there would be no severe water shortage this summer. However, since March, rising temperatures have increased water consumption and evaporation rates, worsening the crisis.

April has recorded some of the highest temperatures this season, with the mercury crossing 40°C on several days and heatwave conditions persisting. While dam levels are 10% higher than last year at the same time, the situation remains delicate, especially with months of summer still ahead.

Gangapur Dam, the main source of water for Nashik city, currently has 3,136 mcft (55%) water stock. Last year at this time, it had 41%.

Other dams like Kashyapi have 1,391 mcft (75%), Punad 927 mcft (56%), Mukne 3,351 mcft (46%), and Valdevi 514 mcft (45%).

In contrast, Gautami Godavari has just 172 mcft (9%), Alandi 187 mcft (22%), and Girna, the largest dam, holds 5,346 mcft (28%).Last year, Nashik Municipal Corporation had proposed water cuts due to low levels in Gangapur Dam, but the decision was stalled due to political resistance during election season. This year, with 14% more storage in Gangapur than last year, officials believe water cuts may not be necessary yet.

Still, with eight dams nearing depletion and intense summer conditions ahead, the administration remains on alert, and water management will be critical in the coming weeks. 

Tags: Gangapur DamNashikWater boardNashik Municipal CorporationHeatwave
Open in App

Related Stories

NashikAshok Kharat Case: ED Investigates Financial Links, No One Will Be Spared, Says CM Fadnavis

PunePune Sees Rise in Temperature After Unseasonal Rains, Heat Likely to Increase

NashikNashik Shocker: Man Arrested After Allegations of Sexual Exploitation, 121 Clips Recovered

NashikNashik Water Cut: Supply to Remain Shut Across City From Today for Repair Work

NashikNashik Car Accident: 9 of Family, Including 5 Children, Die After Car Falls Into Well in Dindori

Nashik Realted Stories

MaharashtraMaharashtra Student Neelam Shinde Dies in US After 14 Months in Coma; Family Fulfils Her Last Wish

MumbaiDhurandhar 2 Leaked: Maharashtra Cyber Police Registered Case Over Leak of Aditya Dhar’s Film ‘Dhurandhar - The Revenge’ on Telegram

MumbaiMumbai: 25 Motorcycles Set On Fire in Dharavi; Case Registered

MumbaiMaharashtra Cyber Cell Busts Fake Currency Racket Operated via Instagram; Two Arrested

MumbaiMumbai: Man Sets Fire to Nameplate Near Kirit Somaiya’s Office in Mulund After Gym Dispute; Video Surfaces