City
Epaper

Cabinet approves to complete Kolkata East-West Metro Corridor Project by 2021 for Rs 8,575 crores

By ANI | Published: October 07, 2020 5:09 PM

Railway Minister Piyush Goyal on Wednesday said the Cabinet has approved to complete the Kolkata East-West Metro Corridor Project at a cost of Rs 8,575 crores by December 2021.

Open in App

Railway Minister Piyush Goyal on Wednesday said the Cabinet has approved to complete the Kolkata East-West Metro Corridor Project at a cost of Rs 8,575 crores by December 2021.

Addressing a press conference after the Cabinet meeting today, he said this will give a boost to the mass transit system.

"12 years ago, Kolkata East-West Metro Corridor Project worth Rs 4,000 crores was approved. But unfortunately, the state government was unable to provide help in land acquisition. The project was not completed. In 2015, PM Modi started the work of alignment again. For the new alignment, the Cabinet today gave the approval to complete the East-West Metro Corridor Project at the cost of Rs 8,575 crores," Goyal said.

"The Cabinet today gave the approval to complete the East-West Metro Corridor Project at the cost of Rs 8,575 crores. This will give a boost to the mass transit system. The 16.6 km long project will be completed by December 2021," he added.

According to the Central government, the total route length of the East-West Metro Corridor Project is 16.6 km consisting of 12 stations that will ease traffic congestion, enhance urban connectivity and provide a cleaner mobility solution to lakhs of daily commuters.

The project envisages the construction of a Metro Corridor between Salt Lake Sector-V to Howrah Maidan in West Bengal for a total route length of 16.6 kms.

The project is being implemented by Kolkata Metro Rail Corporation Limited (KMRCL), which is a Central Public Sector Entreprises under the Ministry of Railways, set up as a special purpose vehicle.

The government said the project includes immense technological challenges like tunnel below river Ganges, which is the first transportation tunnel in India under any major river as well as Howrah Station, which is one of the deepest Metro stations in India.

The mega project envisions the creation of efficient transit connectivity between the business district of Kolkata with the industrial city of Howrah in the west and Salt Lake City in east through a safe, accessible and comfortable mode of public transport.

"Since this corridor connects three most important parts of the Kolkata Metropolitan Area, that is, Howrah, Business area of Kolkata and New Settlements in Salt Lake it is going to revolutionise the mass rapid transport in Kolkata and adjoining Howrah and Bidhanangar. This will connect important landmarks like Howrah, Sealdah, Esplanade, and Salt Lake Sector-V, which is an IT hub," read the government release.

It will integrate multiple modes of transport like the Metro, Sub-urban Railways, ferry, and bus transport by constructing interchange hubs.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Sodium chlorideMetroCabinetKolkata east-west metro corridor projectPiyush GoyalVed prakashShri piyush goyalMetro.co.uk
Open in App

Related Stories

MaharashtraPiyush Goyal Vows to Tackle Water Scarcity and Slum Redevelopment in North Mumbai, Emphasizes Modi's Transformative Schemes

MaharashtraMumbai Lok Sabha Election 2024: BJP's Piyush Goyal Richest Candidate, UBT's Sanjay Patil Owns Least Assets

MaharashtraMaharashtra Lok Sabha 2024: Piyush Goyal's Wealth Surges by ₹10.61 Crores Over Two Years

MaharashtraLok Sabha Elections 2024: Congress Fields Bhushan Patil from Mumbai North Against BJP's Piyush Goyal

MaharashtraMaharashtra Lok Sabha Election 2024: Piyush Goyal Files for Nomination from Mumbai North Constituency

National Realted Stories

NationalAhead of LS polls in Gujarat, 200 Congress members join BJP

NationalBJP hopeful of reclaiming all 14 K'taka LS seats, Cong confident of good show

NationalSexual harassment complaint: Bengal Governor directs Raj Bhavan staff to ignore communications from police

NationalFairPoint: Pak’s misstep in stirring controversy with India's election speeches

NationalIANS Interview: Caste important factor, citizens must know which community has how much population, says Rashid Alvi