City
Epaper

AMC receives Rs 63 cr under 15th finance commission for development

By Lokmat English Desk | Published: September 22, 2021 7:45 PM

Aurangabad, Sept 22:The Aurangabad Municipal Corporation (AMC) municipal commissioner A K Pandey today informed about receiving a fund ...

Open in App

Aurangabad, Sept 22:

The Aurangabad Municipal Corporation (AMC) municipal commissioner A K Pandey today informed about receiving a fund of Rs 63.51 crore under the 15th Finance Commission for the development of the city. The funds will be utilised to undertake 16 important works to facelift the city. The works are expected to start in a month, he said.

The AMC has received such a huge quantity of funds for the first time. It has been received with the initiative of the state tourism minister Aditya Thackeray, pointed out Pandey on Wednesday. The fund will be useful for us to change the looks or facelift the city, he mentioned.

Important works to be undertaken by AMC

Rs 20 crore - For the construction of dividers (of stone-blocks) on main roads of length 31-km, plant trees, construct footpaths. The roads without dividers will be shortlisted.

Rs 10.38 cr - Construction of three garbage transfer stations at Ramnagar, Shivajinagar and Rauza Baugh.

Rs 9 cr - Maintenance of two water pipelines (700 mm and 1400 mm) to enhance lifting capacity of water by 20 MLD, Repairing of an underground tank at Kranti Chowk, repairing of Pharola water treatment plant, installation of new pump set at Jubilee Park Pumphouse, installation of high voltage pumps at Garkheda, old Pharola and Dhorkin.

Rs 8.20 cr - Linking of main sewer lines in Kham and Sukhana Rivers, Nullahs and adjoining drainage pipelines at 270 spots under Sewage Upgradation and Development Programme (SUDP).

Rs 7 cr - Development of vertical garden (Rs 1 cr), beautification of important circles and starting of water fountains (Rs 3 cr) and purchase of three new sweeping machines (Rs 2 cr).

Rs 1.20 cr - Processing on leached (wastewater) oozing out from garbage processing plants.

Rs 1 cr - Scientific disposal of heaps of garbage lying at Chikalthana-Padegaon through bio-mining machines and

Rs 1 cr - Purchase of electric vehicles for the new mayor, deputy mayor as per government's policy.

Tags: Emmanuel LubezkiRauza baughAditya ThackerayAurangabad municipal corporationAMCDevelopment Programme
Open in App

Related Stories

MaharashtraActor from Chitra Wagh's 'Porn Star' Accusation Responds, Threatens Defamation Suit Against BJP Leader

MaharashtraCM Eknath Shinde Accuses Uddhav Thackeray of Power Ambitions, Blames Aditya Thackeray for Interference in Work

MaharashtraBMC Chief Transfer: ECI Has Done What CM Should Have, Says Shiv Sena (UBT)

MaharashtraBMC Khichdi COVID-19 Scam Case: ED Attaches Properties Worth Rs 88.51 Lakh of Suraj Chavan, Close Aide of Aditya Thackeray

MaharashtraProposed Residential Towers Worth Over Rs 12,000 Crores Threaten Seawoods Wetland

Aurangabad Realted Stories

AurangabadMGM to hold CETs from May 16 to 18

AurangabadYear 2009 saw the lowest turnout of voters for A’bad Lok Sabha in past five decades

AurangabadCitizens vouch for iconic qualities in new MP

AurangabadCity schools achieve 100 pc result in ICSE result

AurangabadOwaisi appeals deprived classes to unite for justice