City
Epaper

Gujarat Hydropower Plants Generate Record 1,067.3 MU in August 2024 Amid Monsoon Surge

By ANI | Updated: September 9, 2024 17:40 IST

Gandhinagar (Gujarat) [India], September 9: In August 2024, Gujarat's hydropower plants achieved a remarkable electricity generation of 1,067.3 million ...

Open in App

Gandhinagar (Gujarat) [India], September 9: In August 2024, Gujarat's hydropower plants achieved a remarkable electricity generation of 1,067.3 million units (MU), a significant increase from the 308.7 MU recorded in July 2024. This surge is largely attributed to the state's dams reaching full capacity due to the abundant water inflows during the monsoon season.

The Sardar Sarovar Dam, a key player in Gujarat's water and energy management, alone generated over 800 MU of electricity, with a total of 891 MU coming from both the Sardar Sarovar River Bed Power House (RBPH) and Canal Head Power House (CHPH).

The detailed breakdown of hydropower generation in August 2024 highlights impressive increases across various plants. The Ukai Dam generated 143.1 MU, while the Kadana Dam produced 30.9 MU. Notably, the Sardar Sarovar RBPH and CHPH power stations contributed 757.1 MU and 134.3 MU, respectively.

Gujarat's performance in hydropower generation has shown consistent growth over the years. From 2019 to 2024, the major dams in the state, including Ukai, Kadana, Panam, and Sardar Sarovar, have averaged an annual generation of 4,600 MU. Gujarat guided by Chief Minister Bhupendra Patel, is pushing towards India's target of achieving 500 GW of non-fossil fuel capacity by 2030, aims to boost the renewable energy share to at least 50 per cent of the total installed capacity.

A range of projects, including solar rooftops, hydroelectric power plants, and large renewable energy parks, are being actively pursued to enhance Gujarat's renewable energy production. Recent heavy monsoon rains have further accelerated these efforts, leading to record-breaking power generation from the state's major dams.

The year 2022-23 saw a peak with 6,170.456 MU of hydropower, reflecting a 134 per cent increase from the previous year. For the fiscal year 2023-24, the state's total hydropower generation was 4,584.932 MU.

This success is rooted in the foresight of former Chief Minister Narendra Modi, who established Gujarat as a leader in renewable energy. Under his tenure, Gujarat became the first state in India to create a Climate Change Department, enabling it to implement sustainable measures and advance towards energy transition and net-zero goals.

Gujarat is making advancements in its renewable energy sector, contributing to India's clean energy goals.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Hydropowergujarat
Open in App

Related Stories

NationalNew Year 2026 Gift for Railway Passengers: Ashwini Vaishnaw Announces Bullet Train Launch Date, Vande Bharat Sleeper Route and Fare

NationalEarthquake in Gujarat: Quake of Magnitude 4.4 Hits Kachchh

NationalSurat: Man Narrowly Escapes Death After Getting Stuck on 8th Floor While Slipping From 10th Floor; Nail-Biting Video Goes Viral

Social ViralViral Video: Surat Industrialist Blocks Road, Bursts Firecrackers to Celebrate Son’s Birthday; Booked

NationalSurat Airport: Hydroponic Weed Worth Rs 6.18 Crore Seized From Couple

Business Realted Stories

NationalRajnath Singh to unveil portraits of Vajpayee, Madan Mohan Malaviya at Delhi Assembly today

NationalPM Modi to inaugurate exposition on Lord Buddha’s Piprahwa Relics in Delhi today

NationalBihar: Sub-inspector caught red-handed while taking bribe in Nawada

NationalTime has come to make Odisha corruption-free: CM Mohan Majhi

NationalDrugs worth Rs 33.18 crore seized in Mizoram, one arrested