City
Epaper

Mumbai: Ridge Road in Malabar Hill area reopens after gap of over two years

By Lokmat English Desk | Published: January 30, 2023 1:29 PM

After a gap of two and a half years, the BG Kher Road, popularly known as the Ridge Road in ...

Open in App

After a gap of two and a half years, the BG Kher Road, popularly known as the Ridge Road in the Malabar Hill region, was restored to motorists over the weekend. The road was extensively damaged by two landslides in the year 2020 over a period of 50 days, and it was kept closed as a result.

A major landslide on August 6 at Doongerwadi at Malabar Hill on BG Kher Road toward N S Patkar Road occurred following significant rains, causing damage to a section of Peddar Road. A 150-meter section of BG Kher Road has sunk by four to six feet.

Due to the closure of the road, traffic was diverted to Walkeshwar Road, Nepeansea Road, and NS Patkar Road. Traffic congestion is likely to decrease after the reopening.

Tags: maharashtramumbaiMalabar Hill
Open in App

Related Stories

MumbaiMumbai Airport Customs Seize Gold Over 10 Kg Worth Rs 6.64 Crore in 3 Days; Five Passengers Arrested

MaharashtraAnna Hazare to Challenge Clean Chit Given to Ajit Pawar in Shikhar Bank Scam Case

MumbaiMumbai: Body of Infant Found on Roadside in Dharavi; Police Launch Investigation

NationalAre The Pawars And Deve Gowda Dynasties More Powerful Than The Gandhis? At Least In Numbers, Yes!

NationalThane Accident: Police Constable and Woman Crushed to Death by Speeding Dumper in Vartak Nagar

Maharashtra Realted Stories

ThaneThane Weather Update: IMD Forecasts Week-long Persistent Rainfall

MumbaiNine Students Challenge Burqa Ban in Mumbai College, Move Bombay High Court

MumbaiMumbai Weather Update: Thunderstorms Expected with Moderate to Heavy Rain Across City and Suburbs

MaharashtraMaharashtra Government Halts Smart Meter Rollout for Residential Use, Shifts Focus to Industrial Consumers

MaharashtraSunetra Pawar Poised for Rajya Sabha, Says Will Accept Central Ministry Post if Offered