City
Epaper

Aqua Line: Mumbai's First Underground Metro from Colaba to SEEPZ to Begin Soon

By Lokmat English Desk | Updated: July 17, 2024 12:54 IST

Mumbai Metro line 3, also known as the Mumbai Metro Aqua line, will take its first tour on Colaba-Bandra-SEEPZ ...

Open in App

Mumbai Metro line 3, also known as the Mumbai Metro Aqua line, will take its first tour on Colaba-Bandra-SEEPZ on July 24, confirmed national general secretary of the Bharatiya Janata Party (BJP) Vinod Tawde on Wednesday, but later he deleted that tweet. 

In a post on X, formerly Twitter, Twade said, "Prime Minister Narendra Modi had given a guarantee to make the life of Mumbaikars easier and this is going to be fulfilled."

"Mumbai's first underground metro (Aqua Line) is starting from July 24, which will give new impetus to the speed of the city," he added.

The Aqua Line's project phase one from Colaba to SEEPZ in Mumbai will be operational from July 24, 2024. The under ground unique metro line is operated by Mumbai Metro Rail Corporation Ltd. (MMRCL) and it is all preparing for the launch soon.

According to the reports, the construction work at the Aarey Depot is completed and some minor finishing work is going on and will be finished before the deadline. The Aqua line is estimated to be 33.5 kilometers long, with a daily passenger capacity of 17 lakhs.

Also Read | Mumbai: Stampede-Like Situation As Thousands Turn Up for Air India’s Walk-In Interviews in Kalina, Video Goes Viral.

This metro is connected with 8 different railway stations, MSRTC (Maharashtra State Road Transport Corporation), and metro line 2B and 1. Its Mumbai fully underground metro with 26 underground stations out of 27 stations.

The Journey will start from Arey colony - SEEPZ - MIDC - Marol Naka - CSMIA T2 - Sahar Road - CSMIA T1 - Santacruz - Vidyanagari - BKC - Dharavi - Shitladevi Temple - Dadar - Siddhivinayak Temple - Worli - Acharya Atrey Chowk - Science Museum - Mahalaxmi - Mumbai Central - Grant Road - Girgaon - Kalbadevi - Chhatrapati Shivaji Maharaj Terminus - Hutatma Chowk - Churchgate - Vidhan Bhawan - Cuffe Parade.

Tags: Aqua LineMumbai Underground MetroMumbai MetroMumbai Metro Line 3
Open in App

Related Stories

MumbaiMumbai Metro Line 4 Milestone: First Trial Coaches Placed on Tracks in Thane

MumbaiMumbai Metro 3 Timetable Update: Aqua Line Services Extended for Ganeshotsav 2025; Check Dates and Timings

MumbaiMumbai Metro Line 2A and 7 to Operate Till Midnight During Ganeshotsav 2025

MumbaiMumbai Metro Line 12: Know the Ticket Rates, Route Map, Opening Date, and Latest Construction Update

MumbaiMumbai Metro Line 3: Worli to Cuffe Parade Launch Delayed, New Target Set for August-End

Mumbai Realted Stories

MumbaiMumbai Police Grants Conditional Permission for Manoj Jarange Patil’s Maratha Quota Protest at Azad Maidan on August 29

MumbaiAndhericha Raja 2025: Azad Nagar Public Festival Committee Marks 60th Ganeshotsav With Sarangpur Hanuman Temple Theme

ThaneGhodbunder Road Traffic Update: Long Queues of Vehicles Reported, Cop Injured After Two Loaded Trucks Collide in Thane

MaharashtraPalghar News: Man Found Dead in Virar East Lake; VVCMC Workers Recover Body

MaharashtraGanesh Chaturthi 2025: Maharashtra CM Devendra Fadnavis, Wife Amruta Perform Aarti at Mumbai Residence (Watch Video)