City
Epaper

Mumbai: PM Modi To Perform Bhoomipujan of Third Phase of Twin Tunnel On July 13; All You Need To Know About Goregaon-Mulund Link Road

By Amit Srivastava | Updated: July 11, 2024 18:35 IST

Prime Minister Narendra Modi performed the bhoomipujan (groundbreaking ceremony) of its third phase ambitious Goregaon-Mulund Link Road (GMLR) Project, ...

Open in App

Prime Minister Narendra Modi performed the bhoomipujan (groundbreaking ceremony) of its third phase ambitious Goregaon-Mulund Link Road (GMLR) Project, which aims to connect the eastern and western suburbs of Mumbai on Saturday evening at NESCO Exhibition Center, Goregaon. The twin tunnels will pass under the Sanjay Gandhi National Park.

Project Overview:Third Phase of GMLR

The Goregaon-Mulund Link Road (GMLR) Project is designed to facilitate smoother travel between Mumbai's eastern and western suburbs, reducing travel time from 75 minutes to 25 minutes. The third phase involves the construction of twin tunnels under the Sanjay Gandhi National Park, each 4.7 km long.

Twin Tunnel Project Details:Length: 4.7 km each, with a total length of 6.65 km including approach roads.Depth:20 to 160 meters underground.Connectivity: Tunnels will be interconnected every 300 meters.Construction: Using Tunnel Boring Machines (TBM) with a diameter of 14.2 meters.Facilities: Advanced lighting, ventilation, fire-fighting systems, CCTV, control rooms, and utility conduits for water supply and drainage.Environmental Care: No land acquisition in the Sanjay Gandhi National Park; animal passages for wildlife safety.Carbon Reduction: Estimated annual reduction of 22,400 tons of CO2 emissions.Cost: Rs 6301.08 crores.Completion: Expected by October 2028.Current Status: Land surveying, soil testing, temporary road diversions, and preliminary design work are underway.Rehabilitation: Construction of 7 buildings (G+23) and a market building (G+3) for displaced residents and businesses.

GMLR Project Benefits:

  • Enhanced Connectivity: GMLR will be the fourth major link connecting Mumbai's suburbs, particularly benefiting North Mumbai.
  • Reduced Traffic Congestion: Direct connection between eastern and western suburbs, alleviating traffic woes.
  • Access to New Airport: Direct route to Navi Mumbai's new airport and the Pune-Mumbai Expressway.
  • Travel Time Reduction: Travel distance will be reduced by 8.80 km compared to the Jogeshwari-Vikhroli Link Road, cutting travel time between Goregaon and Mulund to 25 minutes.
  • Fuel Savings and AQI Improvement: Significant fuel savings and improved air quality index in Mumbai.
Tags: Mumbai NewsPm ModiGoregaon-Mulund Link Road
Open in App

Related Stories

MumbaiMumbai Crime: Cyber Café Operator Held for Forging Government Documents in Cuffe Parade

MumbaiMumbai: 39-year-old Gas Agency Owner Cheated of Rs 99 Lakh by Extortionists Posing as Police Commissioner

MumbaiMumbai: BJP MLA Parag Shah Allegedly Slaps Auto-Rickshaw Driver For Violating Traffic Rules In Ghatkopar (Watch Video)

MumbaiMumbai: Conman Posing as Black Magic Expert Escapes With ₹10 Lakh Gold in Vile Parle

MumbaiActor Gajendra Chauhan Scammed Online, Oshiwara Police Swiftly Refund Amount

Mumbai Realted Stories

MumbaiMumbai Local Train Shocker: Man Pushes College Girl Off Moving Panvel–CMST Train, Arrested

MaharashtraMaharashtra Local Body Election Results 2025: State BJP Chief Claims Decisive Mandate for Mahayuti Says Opposition's Fake Narratives Rejected

MaharashtraPalghar Local Body Election Results 2025: BJP-led Mahayuti Registers Clean Sweep Across Multiple Municipal Councils

Mumbai‘Rickshaw Was at Full Speed’: BJP MLA Parag Shah Explains Viral Video of Him Slapping Auto Driver in Ghatkopar

MaharashtraMaharashtra Local Body Elections Results 2025: Mahayuti Crosses 200-Mark, BJP Emerges as Single Largest Party