City
Epaper

MDL delivers first 'Project 15B Class Destroyer' ship to Indian Navy

By IANS | Updated: October 31, 2021 11:55 IST

Mumbai, Oct 31 The Mazagaon Dock Shipbuilders Ltd (MDL) has delivered the first ship of the 'Project 15B ...

Open in App

Mumbai, Oct 31 The Mazagaon Dock Shipbuilders Ltd (MDL) has delivered the first ship of the 'Project 15B Class Destroyer', or Yard 12704 (Visakhapatnam) to the Indian Navy, an official said here on Sunday.

The acceptance documents were signed by retired Vice Admiral Narayan Prasad, who is Chairman & Managing Director of MDL and Rear Admiral K.P. Arvindan on Thursday in the presence of top officials of the Indian Navy and MDL.

The ship is constructed using Indigenous Steel DMR 249A and is amongst the largest destroyers built in India, with an overall length of 164 meters and a displacement of over 7500 tons.

It can undertake a variety of tasks and missions, spanning the full spectrum of maritime warfare, with its array of supersonic Surface-to-Surface aBrahmos' missiles and 'Barak-8' Long Range Surface to Air Missiles.

For undersea warfare, the destroyer is fitted with indigenously developed anti-submarine weapons and sensors, prominently the Hull mounted Sonar Humsa NG, Heavy weight Torpedo Tube Launchers and Rocket Launchers.

Significantly more versatile than the previous Destroyers and Frigates, the Visakhapatnam's all-round capability against enemy submarines, surface warships, anti-ship missiles and fighter aircraft will enable it to operate without a bevy of supporting vessels, and enable it to function as the flagship of a Naval task force.

With a capacity of accommodating 312 crew, it has an endurance of 4,000 Nautical Miles and can carry out a typical 42 days mission with extended mission time in out of area operation.

The ship is equipped with two helicopters onboard to further extend its reach, is propelled by a powerful Combined Gas & Gas Propulsion Plant (COGAG), consisting of four reversible Gas Turbines, which enables her to achieve a speed of over 30 knots (@ 55 kmph).

It also has a very high level of automation with sophisticated digital networks such as Gigabyte Ethernet based Ship Data Network (GESDN), Combat Management System (CMS), Automatic Power Management System (APMS) and Integrated Platform Management System (IPMS).

The indigenous content in P15B Class destroyers is 72 per cent which is a notch higher than its predecessors P15A (59 percent) and P15 (42 per cent) Class Destroyers.

The second ship of P15B 'Mormugao' was launched on September 17, 2016 and is being readied for harbour trials before it commences Sea Trials.

The third ship 'Imphal' was launched on April 20, 2019 and is at an advanced stage of outfitting, while the fourth ship is under block erection and will be launched within this fiscal.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Mazagon Dock ShipbuildersNarayan prasadvisakhapatnammumbaiIndian NavyAp assemblyIndian navy ships
Open in App

Related Stories

NationalMumbai to Lucknow Air India Flight AI-2491 Cancelled Due to Operational Reasons

MumbaiMumbai: Cyber Fraudsters Pose as ATS and J&K Police Officials, Extort Rs 22.4 Lakh from 64-Year-Old Woman

MumbaiMumbai’s New Carnac Bridge Set to Open Next Week: 4-Lane Steel Structure to Ease South Mumbai Traffic

MumbaiMumbai: Dahisar Police Arrested Man For Blackmailing Women Using AI-Generated Nudes, 13,000 Pics Found in Mobile

MumbaiMumbai: Passengers Injured After BEST Bus Collides With Tempo on Aarey Colony Road in Goregaon

National Realted Stories

NationalHungry thief who cooked himself a meal in Kerala hotel before fleeing with Rs 25,000 arrested

NationalBlast at Haridwar Firecracker Factory Leaves Two Injured, Causes Lakhs in Damages (Watch Video)

NationalPanchayati Raj Ministry to join Bhashini to boost e-governance at grassroot level

NationalMP: Another incident of same-sex marriage comes to light in Chhatarpur village

NationalGujarat govt brings ordinance to align state GST law with Centre’s 2025 amendments