City
Epaper

Trial run at Pharola water plant successful, says civic body

By Lokmat Times Desk | Updated: August 17, 2025 22:25 IST

Chhatrapati SambhajinagarThe Maharashtra Jeevan Pradhikaran (MJP) carried out a trial run of the new 26 MLD water treatment ...

Open in App

Chhatrapati Sambhajinagar

The Maharashtra Jeevan Pradhikaran (MJP) carried out a trial run of the new 26 MLD water treatment plant at Farola on Sunday. Officials claimed that treated water reached the distribution tank at Nakshtrawadi during the run. The municipal corporation said minor technical issues in purification are being fixed.

Municipal administrator G. Sreekanth, MJP chief engineer Manisha Palande, executive engineer Tushar Tekwade, civic coordinator K. M. Phalak, and vigilance squad head M. B. Kazi inspected the plant and supply pipeline. According to the civic body, water from Farola successfully reached the Master Balancing Reservoir (MBR) at Nakshtrawadi. Once water storage at the MBR increases, the city’s distribution cycle is expected to shorten by at least two days, officials said.

Open in App

Related Stories

AurangabadCSMC election results on mobile phones

AurangabadPolice officer seriously injured by kite string in Vaijpur

AurangabadComments of leaders on poll day

AurangabadBJP–Shinde Sena clash after polling ends; photojournalist assaulted, camera smashed

AurangabadVoting got momentum at Prabhag 3 & 5 after 11 am

Aurangabad Realted Stories

AurangabadKhaire takes dig at Danve

AurangabadElection Sidelights

AurangabadSmooth polling barring minor EVM glitches

AurangabadConfusion, allegations, and tension over fake Aadhaar cards and polling materials

AurangabadQueues of voters seen, peaceful polling at Zone 8