City
Epaper

Shuakhevi hydro power project in Georgia begins commercial production

By ANI | Published: March 27, 2020 5:38 PM

Adjaristsqali Georgia LLC (AGL), a joint venture between Tata Power, Norway's Clean Energy Invest (CEI) and International Finance Corporation (IFC) on Friday announced the start of commercial operation at 178 megawatt Shuakhevi Hydro Power Project (Shuakhevi HPP) located in southwest Georgia.

Open in App

Mumbai (Maharashtra) [India], Mar 27 : Adjaristsqali Georgia LLC (AGL), a joint venture between Tata Power, Norway's Clean Energy Invest (CEI) and International Finance Corporation (IFC) on Friday announced the start of commercial operation at 178 megawatt Shuakhevi Hydro Power Project (Shuakhevi HPP) located in southwest Georgia.

Tata Power, India's largest integrated utility, holds 40 per cent shares in the joint venture.

The Shuakhevi HPP is the only project in Georgia's energy sector which has been funded by three of the largest financial institutions: European Bank of Reconstruction and Development (EBRD), Asian Development Bank (ADB) and IFC, a member of the World Bank Group.

The project will generate around 450 gigawatt hours of clean energy to reduce the emission of greenhouse gases by more than two lakh tonnes a year.

"The successful completion and start of commercial operations are considered crucial for the integrity, security and energy independence of Georgia," Tata Power said in a statement.

The power generated by the project will be exclusively sold within Georgia throughout the winter which is a period of energy deficit in that country, it added.

( With inputs from ANI )

Tags: Shuakhevi Hydro Power PlantindiamumbaiTata Power
Open in App

Related Stories

MaharashtraMumbai Faces Second Heatwave of Season, IMD Issues Warning as City Sizzles at 38 Degrees Celsius

InternationalIndia-Bound Andromeda Star Oil Tanker Hit by Missiles in Red Sea, Say Yemen’s Houthis

Maharashtra‘Why No Muslim Candidate In Maharashtra?’: Upset Congress Leader Naseem Khan Lashes Out At Party

BusinessHeatwave Impact: Vegetable Prices to Stay High Until June in India due to Above-Normal Temperatures

NationalWeather Update: IMD Predicts Heat Wave Conditions for East and South Peninsular India Over Next Five Days

Maharashtra Realted Stories

MaharashtraMaharashtra: Sleeping Pod Facility with Modern Amenities to Be Set Up at Matheran Railway Station; Booking Through Mobile App

MaharashtraPM Modi in Maharashtra Today: Pune Traffic Police Issues Advisory; Check Details

MaharashtraMaharashtra Lok Sabha Election 2024: MVA's Nashik and Dindori Candidates to File for Nomination Today

MaharashtraMaharashtra Lok Sabha Election 2024: Congress Suffers Setback in Kalyan Constituency as Former Corporator Joins Shinde Group

MaharashtraHeat Wave: Maharashtra Records Temperature Over 40 Degrees Celsius on April 28