City
Epaper

Thane Traffic Update: Police Issue Advisory for Metro’s U-Girder Installation Work on Ghodbunder Road; Check Timing and Diversion Route

By Nirmeeti Patole | Updated: March 27, 2024 12:34 IST

Traffic changes have been implemented by the Thane Traffic Police due to ongoing work by Reliance Astaldi Company to ...

Open in App

Traffic changes have been implemented by the Thane Traffic Police due to ongoing work by Reliance Astaldi Company to place U-girders between Tatvadnyan Vidyapeeth and Wagbil Bridge, which falls under MMRDA jurisdiction. The entry for vehicles traveling from Thane to Ghodbunder Road via Wagbil Bridge will be closed from 11:55 pm on March 26 to 4 am on March 27, and again from 11:55 pm on March 31 to 4 am on April 1. 

An alternative route has been designated for vehicles heading in this direction. Drivers will need to make a turn before ascending the bridge and proceed in the opposite direction, then take a cut from the Panchamrut bus stop to reach their destination via the main road.

Due to the ongoing construction of the metro line on Ghodbunder Road, the Thane Traffic Police have implemented traffic changes on this road. An important phase of this line is currently underway in the Ghodbunder area. As part of this work, girders will be erected on the metro pillars in the Waghbil area. 

“It is necessary to close the Wagbil Bridge for traffic from Thane to Ghodbunder Road to avoid traffic congestion and ensure smooth and safe traffic in the area for the convenience of the public,” they said in its press release. They have appealed to motorists to follow the traffic rules and cooperate with the police.

The above traffic advisory will be in force until the work of placing the U-girders is completed during the aforementioned period. This traffic control notification will not apply to police vehicles, fire brigade, ambulances, green corridor, oxygen gas vehicles and other emergency service vehicles.

  • Closure of entry for all vehicles heading towards Ghodbunder on Wagbil Bridge during the placement of U-girders.

Alternative routes provided:

  •  Heavy vehicles diverted through a cut before Wagbil Bridge climb to the opposite direction, leading to the main road via a cut near Panchamrut bus stop.
  • Vehicles from Ghodbunder to Thane directed via the slip road of Wagbil Bridge.

Closure dates and timings:

  • From 11:55 pm on 26/03/2024 to 4:00 am on 27/03/2024.
  • From 11:55 pm on 31/03/2024 to 4:00 am on 01/04/2024.
Tags: Thane Traffic UpdateMumbai NewsGhodbunder RoadThane Traffic Police
Open in App

Related Stories

MumbaiMumbai: Man Arrested for Sending Obscene Messages and Making Harassing Calls to BJP Leader Pankaja Munde

EntertainmentSRK Slams Insider-Outsider Narrative With Brutal Yet Beautiful Honesty (Watch Video)

MumbaiMumbai: CSD Official Files Complaint Over Fake Emails Tarnishing Department’s Image

MumbaiMumbai Cyber Crime: Scammers Posed as TRAI, CBI, IPS Officer and Steal Rs 76.5 Lakh from 77-Year-Old Woman

MumbaiFake Bail Sureties Exposed at Vikroli Court; Two Held, One on the Run

Maharashtra Realted Stories

ThaneHit-and-Run in Thane: Speeding Car Kills 5-Year-Old Girl, Injures Sister

MumbaiMumbai Road Accident: 58-Year-Old Security Guard Crushed to Death by Truck on Western Express Highway

MumbaiAfter Pahalgam: India Faces Digital Onslaught with Over 10 Lakh Cyber Attacks

Navi MumbaiNavi Mumbai Traffic Alert: Major Traffic Restrictions Near D.Y. Patil Stadium for A.R. Rahman Show on May 3, Check Alternate Routes

ThaneThane Municipal Corporation Launches 50 Water Stations to Combat Heatwave