City
Epaper

Vande Bharat trains production to start in Latur from next year

By Lokmat English Desk | Updated: February 2, 2023 12:07 IST

The production of Vande Bharat trains will start at the Rail Coach Factory in Latur by the end of ...

Open in App

The production of Vande Bharat trains will start at the Rail Coach Factory in Latur by the end of the next fiscal year, in March 2024. Every week, the railway ministry aims to produce three Vande Bharat trains.

On Wednesday, Ashwini Vaishnaw, Minister of Railways, Communications, Electronics and Information Technology, said that one Vande Bharat train is currently produced every week at the Integral Coach Factory in Chennai.

Production of Vande Bharat trains will start in the Rail Coach Factory in Latur, Maharashtra Modern Coach Factory, and Rail Coach Factory Sonipat by the end of the next fiscal year.

Apart from that, metro train production is also on the cards. The first train of this type will be ready by the end of 2023. Similarly, the first hydrogen trains in the country will also be ready by the end of this year. Hydrogen-powered trains will be introduced on narrow-gauge heritage routes of the Indian railways.

Talking about the infrastructural development in the Indian Railways, Vaishnaw told reporters that currently a 12-kilometre-long track is being laid down in the country, and they are targeting to lay down a 16-kilometre-long track daily in the country by next year. Ashwini Vaishnaw also said that 1,275 railway stations in the country are being redeveloped under the Amrit Bharat station scheme, including CSMT of Mumbai.

The Indian Railways has decided to introduce around 400 Vande Bharat trains on different routes across the country in the coming years, with 100 of them being produced at the Rail Coach Factory in Latur, Maharashtra.

"The Marathwada Rail Coach Factory is going to significantly contribute to the overall development of this aspirational region of Maharashtra by heralding a modern industrial ecosystem," a railway official said, adding that the factory had been designed with an initial capacity of manufacturing 250 MEMU/EMU/LHB/trainset-type advanced coaches per annum.

Tags: maharashtralaturVande BharatAshwini vaishnav
Open in App

Related Stories

MaharashtraLatur: Minor Dalit Girl Kidnapped and Raped By 18-Year-Old Man, Case Against Cafe Land Owner

PunePune Shocker: Teen Stabs Classmate to Death Inside Coaching Center In Rajgurunagar Over Heated Argument

MaharashtraLatur Shocker: Man Allegedly Tied, Set Ablaze Inside Car; Family Demands Arrest of Accused

MaharashtraMaharashtra: Father and Son Killed After Car Crashes into Container While Returning from Mumbai Airport

MumbaiMumbai: 41-Year-Old Man Defrauded of Rs 86.85 Lakh in Share Market Investment Scam; Case Registered

Maharashtra Realted Stories

MumbaiJolt to Congress Ahead of Local Body Polls as MLC Pradnya Satav Set to Join BJP: Reports

MumbaiMumbai Shocker: Minor Girls Raped After Being Drugged in Soft Drinks; Accused Arrested Within Six Hours

MaharashtraMaharashtra News: Road Work Dispute in Dharashiv Leads to Brutal Knife Attack, One Injured

MumbaiMumbai Paper Leak: FIR Filed Against Tuition Teacher for Making Minor Leak Maths Proficiency Exam Questions

MumbaiMumbai Police Rescue 9-Foot-Long Python From Dharavi, Share Video