City
Epaper

Provisions Worth Rs. 734.16 Crore for Maintenance of Mumbai Metro Line 6 for 15 Years

By Lokmat English Desk | Published: February 01, 2024 11:24 AM

Mumbai: Tenders have been floated for Metro Line 6. Rs 734.16 crore will be spent on comprehensive maintenance for ...

Open in App

Mumbai: Tenders have been floated for Metro Line 6. Rs 734.16 crore will be spent on comprehensive maintenance for 15 years after a two-year maintenance period including power supply, traction works, electrical and mechanical, lift and sliding staircase design, construction, supply, installation, consolidation, testing and operation of the Metro 6 line from Swami Samarthangar to Vikhroli.

The Mumbai Metropolitan Region Development Authority (MMRDA) has started work at a fast pace to ensure speedy completion of metro projects in the Mumbai Metropolitan Region and subsequent maintenance. 

  • Metro Line 6 is an elevated line.
  • Metro Line 6 has a length of 15.31 km.
  • 73.25 per cent of the construction on the route has been completed.
  • This is the route between Swami Samarthangar and Vikhroli.
  • The line has 13 stations.
  • It will pass through Jogeshwari, Western Expressway and Powai
  • Mumbai Metro Line 6 connects other metro lines 2A, 3, 4 and 7. It has 13 stations. In addition, it connects Jogeshwari Kanjurmarg suburban railway.

 

Tags: Mumbai MetroMumbai Metro Line 6JogeshwariMmrdamumbaiVikhroli
Open in App

Related Stories

PunePune: Elderly Woman Duped of Rs 2.80 Crore in Parcel Scam, Cyber Police Investigate

MumbaiMumbai: BEST Celebrates 150 Years with Special Exhibition at Anik Depot Museum

MumbaiMumbai: 19-Year-Old Dies in Trombay Due to Suspected Food Poisoning After Eating 'Shawarma'; Two Vendors Arrested

MumbaiMumbai: Case Registered Against Celebrity Designer Archana Kochhar and Others for Alleged Molestation and Assault in Juhu Area

MumbaiMumbai: Second Girder of Andheri's Gokhale Bridge to be Installed by Sept 30

Mumbai Realted Stories

MumbaiMumbai: Man Detained for Chasing Car Behind Chief Minister's Convoy on Bandra-Worli Sea Link

MumbaiMumbai Monsoon 2024: BMC Identifies 188 Dangerous Buildings in Mumbai, Urges Residents to Evacuate

MumbaiMumbai Water Crisis: BMC Reassures Mumbai Residents of Adequate Water Supply Until July 31st

MumbaiMumbai High Tide Forecast: Wave Measuring 4.88 Meters Expected at 12.16 PM on May 8

NationalSalman Khan House Firing Case: Mumbai Crime Branch Arrested 5th Accused From Rajasthan