City
Epaper

Mumbai: CR to operate mega block between Matunga and Mulund on Feb 5

By Lokmat English Desk | Updated: February 4, 2023 20:34 IST

The Central Railway (CR) announced on Saturday that its Mumbai division will operate a mega block on its suburban ...

Open in App

The Central Railway (CR) announced on Saturday that its Mumbai division will operate a mega block on its suburban sections on February 5 to carry out various engineering and maintenance works. On Sunday, the CR will carry out numerous engineering and maintenance work between Matunga and Mulund.

In a statement, the CR said, "The mega block would be operated on the Matunga-Mulund up and down fast lines from 11.05 am to 3.55 pm on February 5."

The down-fast line services from Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 a.m. to 3.35 p.m. will be diverted to the down-slow line between Matunga and Mulund stations, halting as per their respective schedule. Meanwhile, the fast trains beyond Thane will be re-diverted on down fast lines at Mulund and will arrive at the destination 15 minutes behind schedule.

The CR further said that the up-fast line services leaving Thane from 10.50 am to 3.46 pm will be diverted on up slow line between Mulund and Matunga halting as per their schedule halts and will be re-diverted on up fast line at Matunga and will arrive destination 15 minutes behind schedule.

The Vadala Road-Mankhurd up and down harbour lines from 11.00 am to 4.00 pm (CSMT - Bandra/Goregaon services) are not to be affected, it said.

The CR said, the down harbour line services to Panvel/Belapur/Vashi leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.03 am to 3.54 pm and up harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/ Belapur/Vashi from 9.40 am to 3.28 pm will remain cancelled.

Suburban train services between CSMT and Bandra/Goregaon will run as per schedule during the block period.  Harbour line passengers are permitted to travel via trans harbour/main line from 10.00 am to 4.30 pm  Special suburban trains will run on the Panvel-Mankhurd section during the block period.

"Passengers are requested to bear with the railway administration for the inconvenience caused. These maintenance mega blocks are essential for infrastructure upkeep and safety," the CR said.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tags: Mumbai local mega blockCSMTMatungaMankhurdCentral Railway
Open in App

Related Stories

MumbaiMumbai: Central Railway Launches QR Code-Based Timetable System for Mail/Express Trains

MumbaiMumbai Local Train Update: Central Railway Announces Power Blocks on Kalyan-Karjat Line Between April 29 to May 5

MumbaiRetirement Ho to Aisa: Mumbai Local Train Motorman Gets Joyful Farewell at CSMT, Dance Video Goes Viral (WATCH)

MumbaiMumbai: Security Beefed Up at Major Railway Stations, Including CSMT

MumbaiMumbai Fire: 10-Year-Old Girl Dies, Woman Critically Injured In Mankhurd Mandala Blaze

Maharashtra Realted Stories

MumbaiDeven Bharti Takes Charge as Mumbai Police Commissioner; Post Returns to ADG Rank After 10 Years

LifestyleHappy Maharashtra Day 2025 Wishes: Messages, Quotes, WhatsApp Status and Images to share and Celebrate Maharashtra Din

MaharashtraSharad Pawar Supports Congress' Call for Special Parliament Session on Pahalgam Terror Attack

NashikNashik Water Crisis: Dam Levels Drop to 33% as Heatwave Grips District

MumbaiMumbai: BMC to Complete Road Concretization by May 31