City
Epaper

Mumbai Coastal Road: Project Hits Milestone as Second Super-Large Girder Installed Successfully

By Lokmat English Desk | Published: May 15, 2024 10:35 AM

The Brihanmumbai Municipal Corporation's ambitious Mumbai Coastal Road Project successfully installed a second super-large girder (bo arch string girder) ...

Open in App

The Brihanmumbai Municipal Corporation's ambitious Mumbai Coastal Road Project successfully installed a second super-large girder (bo arch string girder) connecting the Mumbai coastal road and the Bandra-Worli Sea Bridge route in the early hours of Wednesday, May 15, 2024. The operation, which started at 3 am, was successfully conducted at 6.07 am. The BMC on its X handle has revealed the information along with pictures. 

Also Read | Thane Building Collapse: Portion of Two-Storey Building Collapses in Bhiwandi; 6 Rescued

The installation was postponed after the city was hit by dust storms and unseasonal rains on Monday, 13th May. 

The main challenge was to install the girder just 2.8 meters away from the first one installed earlier.  The drive was conducted under the guidance of Commissioner and Administrator of Brihanmumbai Municipal Corporation  Bhushan Gagrani and Additional Municipal Commissioner (Eastern Suburbs)  Amit Saini. 

Dr Ashwini Joshi, Additional Municipal Commissioner (City), Ashwini Bhide Managing Director, Mumbai Metro Rail; Chakradhar Kandalkar, Deputy Commissioner (Special Engineering), Mumbai Metro Rail;  Girish Nikam, Chief Engineer (Mumbai Coastal Road Project); Mantaiah Swamy, Deputy Chief Engineer; Ajit Gulabchand, President, HCC;  along with all the concerned officials and engineers of the Mumbai Coastal Road Project were present at the project site. 

The girder was established on the route from Nariman Point to Worli. It weighs 2,500 metric tons and is 143 meters long, 31.7 meters wide, and 31 meters high. After completing the remaining works, the next phase of the Mumbai coastal road will start soon.

Tags: Coastal Road projectMumbai Coastal RoadMumbai coastal road projectBandra-Worli sea linkBandraWorli
Open in App

Related Stories

MumbaiMumbai Coastal Road: Second Phase from Marine Drive to Haji Ali to Open by June 10

MumbaiMumbai Coastal Road Water Leakage: CM Eknath Shinde Claims It's Safe After BMC'S 12,000 Crore Project Raises Safety Concerns

MumbaiMumbai Coastal Road Project Faces Criticism After Tunnel Leak

MumbaiMumbai: BMC Slaps Contractors With Rs 2.5 Lakh Penalty for Slow Nullah Cleaning in Bandra and Vile Parle

MumbaiMumbai Police Seize Cocaine Worth Rs. 80 Lakh, Arrest Foreign National

Mumbai Realted Stories

MumbaiMumbai’s Super Cop Krishna Prakash Honored with Hindi Sahitya Bharati Award

MumbaiVistara Airlines Paris-Mumbai Flight Receives Bomb Threat, Makes Emergency Landing in Mumbai

MumbaiMumbai Water Cut: 17-Hour Suspension on June 6-7 in Currey Road, Delisle Road, and Lower Parel, Check Other Affected Areas

EntertainmentMumbai Police Confirms No Complaints Filed After Dispute Outside Raveena Tandon's Home

MaharashtraDombivli Boiler Blast: Maharashtra Government Cuts Power and Water Supply to Hazardous Chemical Units