City
Epaper

Yogi Adityanath inaugurates high speed train trial of Agra Metro

By IANS | Updated: July 26, 2023 21:40 IST

Agra July 26 The high speed train trial of Agra Metro was inaugurated by Uttar Pradesh Chief Minister ...

Open in App

Agra July 26 The high speed train trial of Agra Metro was inaugurated by Uttar Pradesh Chief Minister Yogi Adityanath on Wednesday, at the Taj East Gate Metro Station.

Speaking on the occasion, Yogi said, “I feel very proud to share that now the high speed trials of Agra Metro have commenced and Team Agra Metro has done a commendable job. The whole team is executing the project timely with utmost perfection."

Uttar Pradesh has the maximum number of cities that has operational Metro services. Agra will also emerge as the sixth metro city in future and give plenty of employment opportunities, enhance tourism and boost its image on the world map.

“UPMRC is putting all efforts into achieving this target 6 months ahead of its schedule. The schedule is marked for August 2024 and the team of UPMRC is planning to execute the project by Feb 2024.Metro services will be operational for the people of Agra by February 2024,” he added.

MD UPMRC, Sushil Kumar, said that, “UPMRC has always executed Metro projects timely and ahead of schedule. This time as well we will achieve the same milestone, by delivering a world class Metro to the people of Agra ahead of the set timeline.”

Low speed trials of Metro were already being carried out in the Agra Metro Depot.

Now, the High Speed trials of the Metro trains will commence on the 3 km long elevated viaduct comprising three elevated stations, which is a part of the 6-km long priority stretch (on the first corridor) that runs from Taj East Gate Metro Station to Jama Masjid Metro Station.

Of the total 29.4 km long Metro network, the first corridor runs from Taj East Gate to Sikandara and it is 13.7 kms long. The corridor has six elevated and seven underground stations.

The second corridor runs from Agra Cantt to Kalindi Vihar and is 15.7 kms long. The entire corridor is elevated which includes 14 Metro stations.

The look of Metro trains for Agra Metro Rail Project was unveiled by Yogi Adityanath on August 8, 2022.

All the Metro trains are equipped with regenerative breaking system, and will save up to 35 per cent energy.

The trains are also fitted with carbon dioxide-based sensors which saves energy. With the increasing load of passenger trains, the Co2-based sensors provides an ambient temperature.

The trains will be managed and operated from world class Agra Metro depot and will be operated in automated CBTC mode (Communication Based Train Control) making the train operations absolutely safe and efficient.

--IANS

brij/uk

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: congresspitrodadelhimodideepikabjpwest-bengaldeepika-padukoneajay-devgnthakur
Open in App

Related Stories

PunePrashant Jagtap, Former NCP-SP Pune City Chief, Joins Congress Ahead of PMC Elections

CricketWhen Will Virat Kohli and Rohit Sharma Play Next in Vijay Hazare Troph 2025–26 Match?

MumbaiMumbai: Fake Delhi IPS Officer Arrested in Job Scam; Two Associates Wanted

CricketVijay Hazare Trophy LIVE Streaming: When and Where To Watch Rohit Sharma, Virat Kohli in VHT 2025–26

PunePune: Jolt to Shiv Sena (UBT) as Key Leaders Join BJP Ahead of PMC Elections

Politics Realted Stories

MumbaiWho Is Tejasvee Ghosalkar? Shiv Sena UBT Leader and Former Corporator Joins BJP Ahead of BMC Polls

MaharashtraSanjay Raut Says Sena–MNS Already Together No Need Others Permission

MaharashtraBig Jolt to Sharad Pawar as Salil Deshmukh, Son of Anil Deshmukh, Quits NCP-SP

PoliticsEknath Shinde Issues Strict No-Crossover Order After Meeting Amit Shah; Directive Communicated to All Shiv Sena Leaders

MaharashtraBMC Elections 2025: Devendra Fadnavis Says Clarity on Seat-Sharing Will Emerge in Two Days