City
Epaper

Thane Traffic Update: Vehicular Congestion on Ghodbunder Road After Truck Loaded With Hazardous Chemicals Overturns Near Patlipada Bridge (Watch Video)

By Lokmat English Desk | Updated: September 4, 2024 13:08 IST

Mumbai, September 4: Heavy vehicular traffic was reported on Ghodbunder Road in Thane due to multiple incidents, including an ...

Open in App

Mumbai, September 4: Heavy vehicular traffic was reported on Ghodbunder Road in Thane due to multiple incidents, including an overturned truck carrying hazardous materials near the Patlipada Bridge. Also, some school buses caused a traffic jam by entering the wrong lane during pick-up hours on Wednesday, September 4. According to the information, authorities said that it would take approximately another hour to restore normalcy in traffic.

These occurred after a TATA LPT-4830 BSVI truck with a registered number RJ 14 GR 5871 overturned near the Patlipada Bridge while transporting 34,800 kilograms of chemical used in color preparation. The driver sustained minor injuries and was treated in a nearby hospital.

Visuals From Accident Spot

 

Thane Traffic Update: Vehicular Movement Halted for Hours on Ghodbunder Road After Chemical-Laden Truck Overturns Near Patlipada Bridge (Watch Video).

According to the information, the Disaster Management Cell, traffic police, and fire brigade personnel are working at the spot to clear traffic. The road to Patlipada Bridge has been closed for traffic until further instructions, and vehicles are moving slowly in the area. The police have deployed three cranes and a rescue vehicle to assist in the operation.

Adding to the congestion, local school buses reportedly entered the wrong lane in an attempt to bypass the traffic, leading to heavy vehicular congestion in an already dire area. Schools have informed that bus service will not be available for students in the afternoon session. They will need to arrange their own transportation to school. DCP Traffic said that the traffic status has worsened, indicating that it will take at least another hour to clear the vehicles and restore normal traffic flow.

Meanwhile, after about five hours of effort at the spot, the truck that had an accident near Patlipada Bridge has been moved to one side of the road, and traffic on Ghodbunder Road has been reopened.

Tags: Thane Traffic UpdateThaneGhodbunder RoadGhodbunder Road TrafficMaharashtraroad accidentTruck Accident
Open in App

Related Stories

MumbaiMumbai Metro Line 4 Milestone: First Trial Coaches Placed on Tracks in Thane

MaharashtraLadki Bahin Yojana August 2025 Installment: When Will Rs 1,500 Be Deposited into Women Beneficiaries’ Accounts?

NationalTamil Nadu Road Accident: Eight Students Injured as School Van Overturns Near Railway Track in Virudhachalam (Watch Video)

MumbaiMumbai Accident: 4-Year-Old Dies After Being Hit by Speeding Tempo in Narayan Nagar, Driver Arrested

ThaneThane Traffic Update: Heavy Vehicles Banned from Entering Bhiwandi Until Further Orders; Check Details

Thane Realted Stories

MaharashtraMaharashtra: Father and Son Seriously Injured in Sloth Bear Attack Near Junona Village Chandrapur

MumbaiMumbai: Five Caught Smoking Marijuana, Attack Cops With Knives in Deonar; Arrested

MumbaiGaneshotsav 2025: MSRTC to Operate 275 Festive Buses to Mumbai and Konkan To Ease Passenger Rush

MaharashtraLatur: Woman’s Body Found Stuffed in Suitcase Near Tiru Riverbed, Investigation Underway

MumbaiMumbai Metro 3 Timetable Update: Aqua Line Services Extended for Ganeshotsav 2025; Check Dates and Timings