City
Epaper

Mumbai Metro 3 Aqua Line: Opening Date and Its Impact on City Connectivity; Key Details

By Lokmat English Desk | Updated: October 4, 2024 13:13 IST

Mumbai’s much-anticipated underground Metro Line 3 is poised to revolutionize the city’s transportation system. Prime Minister Narendra Modi is ...

Open in App

Mumbai’s much-anticipated underground Metro Line 3 is poised to revolutionize the city’s transportation system. Prime Minister Narendra Modi is set to partially inaugurate the service on Saturday, October 5, with operations expected to begin on October 6. The first phase of the Aqua Line will cover a 12-kilometer stretch between Aarey Colony and Bandra Kurla Complex (BKC), featuring 10 operational stations that will greatly enhance daily commuting in the city’s bustling regions.

Key Details of the Aqua LineThe fully completed Metro Line 3 will stretch 33.5 kilometers, connecting southern, central, and western Mumbai through 27 stations. The initial operational segment between Aarey and BKC is anticipated to alleviate traffic congestion, particularly in the western suburbs, by providing seamless connectivity to major business hubs and the international airport.

Once fully operational, the Aqua Line will link essential areas such as Nariman Point, Mumbai Central, Worli, and Dadar, offering direct access to Mumbai International Airport. Commuters can expect reduced travel times and enhanced convenience, particularly in high-traffic regions like Santacruz and Ghatkopar.

Also Read| Mumbai Metro 3 Aqua Line Ticket Rates: Everything You Need to Know About Fares, Service Route and More.

Operational PlansIn this phase, nine trains, each comprising eight cars, will operate, accommodating approximately 2,500 passengers per train. A total of 96 trips will be conducted daily, with operational hours set from 6:30 AM to 10:30 PM on weekdays and 8:30 AM to 10:30 PM on weekends. The Aqua Line will also incorporate advanced technology, including driverless train operations managed by 48 trained captains, providing a modern, efficient, and eco-friendly urban transport solution.

Expanding Mumbai’s Metro NetworkInitially scheduled for completion in 2021, the Metro Line 3 experienced delays due to environmental challenges and construction setbacks. With the opening of this phase, the Aqua Line now becomes a crucial component of the city’s expanding metro network, which encompasses 14 planned lines aimed at alleviating traffic congestion and enhancing connectivity across Mumbai.

Tags: Mumbai Metro Line 3Mumbai metro lineAqua LineMumbai News
Open in App

Related Stories

MumbaiMumbai: Elderly Woman Killed as Speeding Car Hits Divider in Borivali; Driver Booked

MumbaiMumbai: Fake YONO App Link Used to Cheat 68-Year-Old Woman of ₹10 Lakh in Vile Parle

MumbaiMumbai: Fake Delhi IPS Officer Arrested in Job Scam; Two Associates Wanted

MumbaiMumbai Crime Branch Arrests Two Women for Alleged ₹10 Crore Extortion Bid

MumbaiMumbai: ₹30 Lakh Bank Fraud Unearthed at Mumbai District Central Co-operative Bank

Mumbai Realted Stories

MaharashtraMaharashtra: FIR Filed Against Satara Man for Molesting Pune Woman After Social Media Friendship

MumbaiMumbai–Pune Expressway Traffic Update: Massive Vehicular Jams Reported Amid Christmas–New Year Rush

MaharashtraNanded: Farmer Couple Found Dead at Home, 2 Sons Found on Railway Tracks; Mass Suicide Suspected

MaharashtraMaharashtra Accident: 4 Women Killed, 5 Injured As Car Plunges off Bridge in Chandrapur

MumbaiMumbai: Fire Breaks Out at 23-Storey Sorrento Tower in Andheri West (Watch Video)