City
Epaper

Mumbai Traffic Update: Bellasis Bridge in Mumbai Central Closed for 18 Months From June 24; Check Alternative Routes Here

By Lokmat English Desk | Updated: June 22, 2024 16:08 IST

The iconic Bellasis Bridge (also called Mumbai Central Bridge) has been declared unsafe by Indian Railways authorities and will ...

Open in App

The iconic Bellasis Bridge (also called Mumbai Central Bridge) has been declared unsafe by Indian Railways authorities and will undergo demolition and reconstruction for the next 18 months. To complete this important infrastructure project, officials will close both side roads for vehicular traffic of the bridge starting June 24, 2024. 

"The Bellasis bridge is declared dangerous for vehicular traffic by Railway authorities. The demolition and reconstruction of bridge will be carried soon. Hence, both bounds of Bellasis Bridge Road will be closed for vehicular traffic for the next 18 months from 24/06/2024," said Mumbai Traffic Police in a statement.

Closure Dates: June 24, 2024, to December 2025 (estimated)

Also Read | Mumbai Traffic Update: Slow Traffic on SCLR Southbound and JVLR Northbound Bridges Due to Vehicle Breakdowns.

Alternative Route:

For those travelling between Mumbai Central Junction and Tardeo Circle Junction, a designated detour route has been established:

Mumbai Central Junction: Proceed towards D.B. Marg and continue to Navjivan Junction. Take a right turn onto Diana Bridge (Patthe Bapurao Road) and follow it to Tardeo Circle Junction.

Tardeo Circle Junction: Take Diana Bridge (Patthe Bapurao Road) to reach Navjivan Junction. Take a left turn onto Dr. D.B. Marg to reach Mumbai Central Junction.

Strict No Parking: To ensure smooth traffic flow on the designated detour route, parking will be strictly prohibited on both sides of Patthe Bapurao Marg (from Tardeo Circle to S. Swaraj Chowk) and Dr. D.B. Marg (from S. Swaraj Chowk to Mumbai Central Junction).

Motorists are advised to plan their journeys in advance and consider using alternative routes or public transport during this closure period.

Tags: Mumbai Traffic UpdateBellasis BridgeMumbai CentralMumbai Traffic PoliceIndian Railways
Open in App

Related Stories

MaharashtraMumbai Thane Traffic Update: Kalwa Kharegaon Underpass on NH-3 Closed from Dec 15 to Jan 9 – Check Alternate Routes & Details

MumbaiMumbai Traffic Update: Police Issues Advisory Ahead of Lionel Messi's GOAT India Tour 2025 Event; Check Restrictions

NationalKonkan Railway Announces Christmas–New Year 4 Special Trains From December 16 to January 7; Check Schedule

NationalIndian Railways Loco Pilots Demand Work-Hour Limits After IndiGo Crisis

NationalIndiGo Flight Cancellations: Indian Railways Deploys 116 Extra Coaches Across 37 Trains to Ease Travel Disruptions

Mumbai Realted Stories

NagpurNagpur: Drone Spotted Over Solar Industries Airstrip, FIR Registered, Investigation Underway

MaharashtraLatur Shocker: Recovery Agent Fakes Death for Rs 1 Crore Insurance, Caught Chatting With Girlfriend

MaharashtraNalasopara Crime: Man Strangles Wife to Death After She Confronts Him Over Extramarital Affair; Arrested

MumbaiMumbai Crime Branch Files 689-Page Chargesheet Against Fake BARC Scientist

ThaneThane Water Cut: TMC to Reduce 50% Supply Until December 19 Due to Pipeline Damage at Kalyan Phata