City
Epaper

Mumbai Metro One Turns 11: Over 111 Crore Passengers Carried Since 2014

By Lokmat English Desk | Updated: June 8, 2025 17:06 IST

Mumbai Metro Line 1, also known as Metro One, the city's first east-west metro route, celebrated its 11th year ...

Open in App

Mumbai Metro Line 1, also known as Metro One, the city's first east-west metro route, celebrated its 11th year of operation on Sunday, marking a significant milestone. Over 111 crore people have been transported across the Versova-Andheri-Ghatkopar (VAG) route, which is 11.4 kilometres long. Operator Mumbai Metro One Private Limited (MMOPL) said, “On its 11-year run, Mumbai Metro One has made more than 12.66 lakh train journeys…” Since its opening, Ghatkopar has received about 30 crore visitors, followed by Andheri with 23 crore and Saki Naka with 11 crore.

When then-CM Prithviraj Chavan inaugurated the Mumbai Metro 1 Blue Line on June 8, 2014, it began operations. According to reports, it has the eighth-highest passenger density of any metro line worldwide. The route has 64 curves in all, the steepest of which is 107 meters (351 feet). In a public-private partnership (PPP) between Reliance Infrastructure and the Mumbai Metropolitan Region Development Authority (MMRDA), Metro One was created as a substitute for the highways and railroads.

Metro Ride Details:

  • Weekday ridership: 500,000 (highest 5.47 lakh)
  • Train trips operated: 12,66,973 (more than 1.2 million)
  • Cumulative kilometres covered: 1,45,21,256
  • Punctuality: 99.99%
  • Availability: 99.96%
  • Frequency: Less than 3.5 minutes during peak hours, with 444 trips.

 

Also Read: Aamir Khan Turns Street Chef in Mumbai, Prepares Vada Pav for Fans in Dadar (Watch Video)

Mumbai Metro 1 connects the Western & Central Railway to the eastern and western suburbs. Versova, DN Nagar, Azad Nagar, Andheri, Western Express Highway, Chakala (J B Nagar), Airport Road, Marol Naka, Saki Naka, Asalpha, Jagruti Nagar, and Ghatkopar are among its twelve stops. At the Andheri and Ghatkopar stations, it makes the transition between the suburban rail system and the MRT system easy and effective. It reduced the travel time between Versova and Ghatkopar from 71 to 21 minutes. It offers rail-based connectivity to commercial projects, the SEEPZ, and the MIDC. The north-south and east-west travel is made easier by its connections to other Metro lines, which include Line 2A at D N Nagar, Line 7 at Western Express Highway, and Line 3 at Marol Naka.

Every year, Metro One offsets more than 67,000 tonnes of CO₂, which is equivalent to planting more than three million trees. According to MMOPL, the line has also received more than 40 distinguished honours for its contributions to service, innovation, and the environment.

Tags: Mumbai metro oneMumbai MetroMetroMumbai metro lineMumbai NewsMaharashtra News
Open in App

Related Stories

MumbaiMumbai: Mumbai: Man Attempts Suicide at Dadar Station by Stabbing Himself, Tries to Jump Before Train; Alert Home Guard Saves Him (Video)

PunePune Water Cut: Supply to Be Disrupted on October 30; Check List of Affected Areas

PunePune Crime: Wakad Police Nab Suspect from Delhi for Sexually Assaulting Woman on False Promise of Marriage

MumbaiMumbai Crime: Delivery Boy Arrested for Molesting 8-Year-Old Girl in Colaba

MaharashtraMaharashtra: NCP (SP) Leader Eknath Khadse’s Bungalow In Jalgaon Looted

Mumbai Realted Stories

PunePune Crime: Youth Attacked with Sickle Over Old Dispute, Case Registered Against Three

MumbaiKalyan: Violent Clash Erupts Between Two Groups Over Bursting Firecrackers During Chhath Puja (Watch Video)

Maharashtra‘Uddhav Thackeray Swallowed Mumbai’s Tijori’: Eknath Shinde Hits Back at Shiv Sena UBT Chief Over ‘Anaconda’ Remark

MumbaiMumbai: Teacher Booked for Beating 13-Year-Old Student in Ghatkopar Over Unfinished Diwali Homework

MumbaiMumbai Weather Update: Yellow Alert Issued for City and Neighbouring Districts; High Humidity Likely